Research@StAndrews
 
The University of St Andrews

Research@StAndrews:FullText >
Management (School of ) >
Management >
Management Theses >

Please use this identifier to cite or link to this item: http://hdl.handle.net/10023/2972
This item has been viewed 125 times in the last year. View Statistics

Files in This Item:

File Description SizeFormat
GopalSIyengarPhDThesis.pdf17.15 MBAdobe PDFView/Open
Title: Procurement and strategy in manufacturing firms
Authors: Iyengar, Gopal S.
Supervisors: McKiernan, Peter
Issue Date: 1994
Abstract: The strategic role of the Procurement function in manufacturing firms has received increased attention in the literature over the past two decades. Before the 1970s, the supply environment was seen to be stable for most firms, with no particular strategic opportunities or threats. Procurement was treated as an administrative or service function. The oil crisis in the early 1970s changed the situation, bringing in its wake acute inflation and material shortages. The 1980s saw a revolution in manufacturing with the advent of JIT, increased automation and global operations. Theoretical researchers saw the potential for a proactive and strategic role for the Procurement function. This was, however, not reflected in empirical research, which failed to find consistent evidence of firms considering Procurement as strategic. This thesis addresses the gap between precept and practice evident in the literature. A major criticism of the empirical literature is the treatment of the strategic (value) activities on the supply side and the activities of the Procurement department as synonymous. This thesis questioned that view and made a distinction between the two activities. A theoredcal framework was built up from the literature to identify the contexts in which Supply considerations would be strategic. Propositions were generated which allowed for strategic Supply activities both through the Procurement department as well as outside it. The empirical work looked at 25 UK manufacturing firms through the case study approach. The cases were scrutinised for evidence of strategic activities on the supply side, as well as the strategic importance of the Procurement department. The results confirmed that (1) Supply considerations were strategic for a majority of firms. (2) Strategic consideration of Supply depended on a number of contingent variables.(3) Strategic Supply activities were not necessarily reflected in the strategic importance given to the Procurement department.
URI: http://hdl.handle.net/10023/2972
Type: Thesis
Publisher: University of St Andrews
Appears in Collections:Management Theses



This item is protected by original copyright

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

DSpace Software Copyright © 2002-2012  Duraspace - Feedback
For help contact: Digital-Repository@st-andrews.ac.uk | Copyright for this page belongs to St Andrews University Library | Terms and Conditions (Cookies)